Our contractors have given us short notice that they will be pulverizing, grading and paving the Grange Sideroad from Winston Churchill Boulevard to Shaw’s Creek Road very soon.
Staff are working to get notices hand delivered to residents as soon as possible.
Brian Baird, OALA
Director, Operations
Operations
Office: 905.584.2272 x 4209
Email: brian.baird@caledon.ca
Town of Caledon | www.caledon.ca | www.visitcaledon.ca | Follow us @YourCaledon